Cummins Highway Construction Update: September 2025
Through September, we will continue installing new curb and green infrastructure from Greenfield Road/Weybosset Street to Woodhaven Street.
Major work on the project between the Wood Avenue/Harvard Street intersection and Woodhaven Street is planned to wrap up this fall. In this segment, major elements of the street are now taking shape.
Green infrastructure is a term for stormwater management that uses natural materials to remove pollutants and absorb water back into the ground. On Cummins, these areas will have a subsurface layer of permeable rock material and raised drains to absorb stormwater.
September 1, 2025 - September 5, 202
- Construction activity will be temporarily paused on Monday, 9/1 (Labor Day) and from Thursday 9/4 to Tuesday, 9/9
- Install curb at roundabout
- Install curb between Bismarck Street and Woodhaven Street
- Begin installing curb between Corman Street and Itasca Street
- Continue pouring cement for driveways between Wood/Harvard and Itasca
September 8, 2025 - September 12, 2025
- Install curb between Ridlon Road and Rugby Road
- Continue pouring cement for driveways between Itasca Street and Woodhaven Street
- Begin paving bike lane from Itasca Street to Woodhaven Street
September 15, 2025 - September 19, 2025
- Install curb between Ridlon Road and Rugby Road
- Begin paving bike lane from Itasca Street to Woodhaven Street