Boston Landmarks Commission

The Boston Landmarks Commission will hold its monthly, virtual public hearing on Tuesday March 25, 2025, at 4 p.m.

ATTENTION: This hearing will only be held virtually and NOT in person. You can participate in this hearing by going to our Zoom hearing or calling 1-309-205-3325 and entering meeting id #986 9220 0856 . You can also submit written comments or questions to BLC@boston.gov.

Public testimony begins at

Discussion Topics

  1. DESIGN REVIEW

    25.0414 BLC - 21 DAVID G MUGAR WAY 

    Roof replacement and installation of new solar panels at Community Boating Boathouse located within DCR's Boston Esplanade. Project Project

    25.0690 BLC - 3-11 SCHOOL STREET

    Replace street-facing upper story non-historic windows for all buildings and box bay windows at 283 School Street; repair masonry where needed; replace an existing window at 11 School Street with a door with loading platform as seen in historic photos; recreate historic corner sign. Project Presentation

  2. ADMINISTRATIVE APPROVALS

    25.0557 SB 10-12 CUMBERLAND STREET, BOSTON, MA - Repoint apex parapet wall in-kind. 

    25.0685 BLC - 310 WASHINGTON ST -Includes repair of existing building enclosure components to address recurring water leakage into the basement level of the Old South Meeting House at the south side of the building along  Milk Street.

     23.0226 BLC BOSTON CITY HALL, 1 CITY HALL SQUARE, BOSTON, MA - Extend approval of HVAC system upgrades at roof that includes installation of air handling units and exposed trunk ductwork to January 26, 2026. 

    25.0580 BSR - 17 BAY STATE ROAD, BOSTON, MA - At front facade, replace basement window in-kind.

    25.0691 BLC 12 SOUTH STREET - Historically appropriate wall covering and paint will be applied in the Southeast Hall and adjacent bathroom.  

    25.0530 AB 1871-1875 COMMONWEALTH AVENUE, BOSTON, MA - On the Chestnut Hill Elevation; remove deteriorated sealant at water table over bay window at unit 5 and recaulk. Repair to original condition. East elevation-Repoint deteriorated masonry area under the chimney. Restore to original condition.

  3. BUSINESS HEARING At 6:00 PM
  4. DESIGN REVIEW MOTION RECAP & FOUR VOTES

    25.0414 BLC - 21 DAVID G MUGAR WAY - Review Motion and Vote

    25.0690 BLC - 3-11 SCHOOL STREET - Review Motion and Vote

    ADMINISTRATIVE APPROVAL ITEMS - Review Motion and Vote

  5. ADVISORY REVIEW

    25.0689 BLC - 1 CITY HALL SQUARE, BOSTON, MA

    The project involves the lowering of three (3) transaction counters to accommodate the construction of ADA-compliant transactional counters. In addition, new furniture, including benching and counters, will be installed. The goal of this work is to enhance the second-floor public transaction area while ensuring accessible counters available for all constituents.

    Project Presentation

     

  6. RATIFICATION OF MEETING MINUTES of March 11, 2025
  7. STAFF UPDATES

    Please let staff know if you are available in advance for our hearing on April 8, 2025

  8. PROJECTED ADJOURNMENT AT 8:00 PM