Public Facilities Commission Meeting (PFD)
The presenter is the Public Facilities Department.
You can also watch the meeting on Boston City TV at Comcast channel 24, RCN channel 13, and on boston.gov/boston-city-tv.
Discussion Topics
-
VOTE 1: Scott Dupre, Project Manager II
CONTRACT TO THE VERTEX COMPANIES, INC.: To provide owner’s project manager services associated with the Massachusetts School Building Authority’s (MSBA) 2017 Accelerated Repair Program (ARP) at Seven (7) Boston Public Schools located in Dorchester, East Boston, Roslindale and Roxbury.
Contract Price: $30,000
That the Director be, and hereby is, authorized to request from the Mayor, in the name and on behalf of the Commission, written authority to award a contract, pursuant to the Massachusetts School Building Authority’s (MSBA) guidelines for its Accelerated Repairs Program (ARP) to The Vertex Companies, Inc., a Delaware corporation, with an office located at 400 Libbey Parkway, Weymouth, MA 02189. Under the terms of this contract, The Vertex Companies, Inc. will provide owner project manager services (OPM) at Seven (7) Boston Public Schools located at:
William E. Russell Elementary School, K1-5, 750 Columbia Road, Dorchester
UP Academy Charter School of Dorchester, K1-8, (f/k/a John Marshall School)
35 Westville Street, Dorchester
Hugh R. O'Donnell Elementary School, K1-5, 33 Trenton Street, East Boston
East Boston High School, 9-12, 86 White Street, East Boston
Charles Sumner Elementary School, K1-5, 15 Basile Street, Roslindale
Maurice Tobin School, K2-8, 40 Smith Street, Roxbury
James P. Timilty Middle School, 6-8, 205 Roxbury Street, Roxbury
The OPM services and fees are limited to the schematic design phase of the project at a cost not to exceed $30,000. The full term of the OPM contract is 104 weeks with 36 weeks dedicated to the schematic design services. The Director is, also, authorized to execute such contract, in the name and on behalf of the Commission, upon receipt of said written authority from the Mayor.
-
VOTE 2: Scott Dupre, Project Manager II
CONTRACT TO THE S/L/A/M COLLABORATIVE, INC.: To provide design and construction administration services associated with the Massachusetts School Building Authority’s (MSBA) Accelerated Repair Program (ARP) at Seven (7) Boston Public Schools located in Dorchester, East Boston, Roslindale and Roxbury.
Contract Price: $258,800
That the Director be, and hereby is, authorized to request from the Mayor, in the name and on behalf of the Commission, written authority to award a contract, pursuant to the Massachusetts School Building Authority’s (MSBA) guidelines for its Accelerated Repairs Program (ARP) to The S/L/A/M Collaborative, Inc., a Connecticut corporation, with an office located at 250 Summer Street, 4th Floor, Boston, MA 02210. Under the terms of this contract, The S/L/A/M Collaborative, Inc. will provide design and construction administration services at Seven (7) Boston Public Schools located at:
William E. Russell Elementary School, K1-5, 750 Columbia Road, Dorchester
UP Academy Charter School of Dorchester, K1-8, (f/k/a John Marshall School)
35 Westville Street, Dorchester
Hugh R. O'Donnell Elementary School, K1-5, 33 Trenton Street, East Boston
East Boston High School, 9-12, 86 White Street, East Boston
Charles Sumner Elementary School, K1-5, 15 Basile Street, Roslindale
Maurice Tobin School, K2-8, 40 Smith Street, Roxbury
James P. Timilty Middle School, 6-8, 205 Roxbury Street, Roxbury
The services and fees are limited to the schematic design phase of the project at a cost not to exceed $258,800. The full term of the design services contract is 104 weeks with 36 weeks dedicated to the schematic design services. The Director is, also, authorized to execute such contract, in the name and on behalf of the Commission, upon receipt of said written authority from the Mayor.