city_hall

Official websites use .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

A lock or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Boston.gov Search

Get direct answers to your questions about City of Boston services, programs, and information. While we strive for accuracy by sourcing directly from Boston.gov, our search can occasionally provide unexpected results. You can help us improve by using the feedback buttons below each answer.

Questions? Contact us at digital@boston.gov.

Choose a search type

Boston Landmarks Commission

The Commission will hold its next public hearing virtually on Tuesday, July 28, 2026 at 4pm.

ATTENTION: This hearing will only be held virtually and NOT in person. You can participate in this hearing by going to our online meeting or calling 646-828-7666 and entering meeting id #165 395 4504. You can also submit written comments or questions to blc@boston.gov.

Public testimony begins at

Discussion Topics

  1. Design Review - 4pm

    APP #26.0829 BLC CHESTNUT HILL RESERVOIR & PUMPING STATIONS:

    Proposed Work: Replace a portion of the existing Chestnut Hill Reservoir Trail and construct new stormwater management features to improve drainage, including a new bioretention swale and bioretention rain garden. CONTINUED FROM 04/28/26

    APP #27.0015 BLC MISSION CHURCH COMPLEX

    Proposed Work: Expansion of grammar school into underutilized portions of rectory building with minor modifications to exterior targeted to interventions to support the school use in portions of the rectory building.

    APP #26.0407 BLC TILESTON HOUSE - REAR ADDITION

    Proposed Work: Addition to the rear of the existing house at 13 River Street.

     

  2. Administrative Review/Approval

    APP # 26.1062 BLC ARLINGTON STREET CHURCH, 351 ARLINGTON STREET 

    Replace gate at south vestibule entrance.

    APP # 27.00142BLC BLACKSTONE BLOCK, 16 NORTH STREET 

    Installation of blade sign.

    APP # 27.0003 BLC BOSTON CITY HALL, 1 CITY HALL SQUARE 

    At interior of building alteration of existing cable suspension system used for temporary art installations located at the 5th floor mezzanine concrete railing.

    APP # 26.1131 BLC HUTCHINSON BUILDING, 44 PROVINCE STREET

    Installation of blade sign.

    APP # 26.1109 BLC DONALD MCKAY HOUSE, 78-80R WHITE STREET

    Repair and replace missing and deteriorated sections of exterior trim and siding.

    APP # 26.1129 BLC SEARS BUILDING, 401 PARK DRIVE

    Exterior rehabilitation of the building including masonry repair and window replacement previously approved in 2024.

    APP # 27.0034 BLC 400-402 MELNEA CASS BOULVARD, EUSTIS STREET ACDC

    Installation of two interpretive signs.

    APP # 26.1150 MHT 1605 TREMONT STREET

    Emergency repair - all work to be done in kind: strip existing roofing and inspect roof, re-shingle area, install 8" aluminum drip edge, re-flash 2 skylights, remove and replace any rotted wood.

     

  3. Business Hearing - 6pm

    RATIFICATION OF MEETING MINUTES

    Commission to vote on meeting minutes from July 14, 2026.

     

    DESIGN REVIEW RECAP AND VOTE

    APP #26.0829 BLC CHESTNUT HILL RESERVOIR & PUMPING STATIONS:

    Proposed Work: Replace a portion of the existing Chestnut Hill Reservoir Trail and construct new stormwater management features to improve drainage, including a new bioretention swale and bioretention rain garden. CONTINUED FROM 04/28/26

    APP #27.0015 BLC MISSION CHURCH COMPLEX

    Proposed Work: Expansion of grammar school into underutilized portions of rectory building with minor modifications to exterior targeted to interventions to support the school use in portions of the rectory building.

    APP #26.0407 BLC TILESTON HOUSE - REAR ADDITION

    Proposed Work: Addition to the rear of the existing house at 13 River Street. 

     

    ADMINISTRATIVE APPROVAL ITEMS

    Review Motion and Vote

     

    STUDY REPORTS & DESIGNATIONS

    305.26 - FOLSOM HOUSE, 3-4 FOLSOM AVE., MISSION HILL

    • Vote to upgrade survey rating
    • Presentation of Study Report
    • Public feedback on Study Report
    • Discussion of Study Report
    • Vote to accept Study Report
    • Vote on Designation

     

    OFFICE OF HISTORIC PRESERVATION UPDATES

    PRESENTATION ON MARKER PROGRAM

     

    STAFF UPDATES

     

    PROJECTED ADJOURNMENT - 7pm

     

Back to top